industry news

Wedge Wire Lauter Tun False Bottom Types

Views : 1207
Update time : 2022-08-04 15:43:38
The false bottom is installed in the Lauter tun to provide support for the grain bed during the mashing in process and to retain the spent grain after runoff is complete.
What should be considered in a good false bottom design?
 
In order to avoid the deformation of the false bottom due to uneven force, enough attention should be paid to the design of the false bottom. The following points need special attention:
1. The false bottom should have enough support points and the distribution should be even. 
2. There should also be support around the false bottom. 
3. There must be fixed pins at the support of the false bottom. 
Different false bottom filter types for different lauter tun



Specifications of wedge wire mash tun screen

Normal Name

Lauter Tun Screen, Mash Tun Screen, False Bottom Screen, Etc.

Diameter Range

(MM)

200mm To 2500mm. Diameter Customized

Normal Diameter

(MM)

29”, 30”, 35”, 37”, 40”, 45”, 47”, 59”, 63”, 74”, Etc

Normal Slot

(MM)

0.7mm, 0.75mm, 0.8mm, 1.0mm, customized

Normal Thickness (MM)

8.5mm, 20mm. 25mm, 30mm, 40mm, 50mm, Customized.

 

Sections & shape

1 Cycle, 2 PCS, 3 PCS, 4 PCS, 6 PCS, 8 PCS. Customized

Wedge wire 

(MM)

2x4MM Wedge Wire, 3x5MM Wedge Wire

Support Rod

 (MM)

3x5MM V-shaped Support Rod, 3x5mm Square Support Rod

Strengthen Rod 

(MM)

Thickness and Height according to the diameter and screen thickness

Note

Usually customized. 

Related News
Read More >>
What Is a Coal Centrifuge Basket and How Does It Work? What Is a Coal Centrifuge Basket and How Does It Work?
Sep .02.2026
Coal centrifuge basket design for coal dewatering, covering slot opening, open area, wedge wire construction, material selection, and centrifuge operating conditions.
Engineering Principles Behind Vee Wire Scallops for Catalyst Support Systems Engineering Principles Behind Vee Wire Scallops for Catalyst Support Systems
Aug .10.2026
Catalyst support systems play a critical role in maintaining stable reactor performance, especially in fixed-bed reactors used in petrochemical, refining, chemical processing, and environmental applications. The internal components must provide reliable catalyst retention, uniform flow distribution, and sufficient mechanical strength under demanding operating conditions.
Tower Internal Wedge Wire Pipe Maintenance and Reliability Tower Internal Wedge Wire Pipe Maintenance and Reliability
Aug .04.2026
Wedge wire pipe, commonly used in tower internals, provides an effective solution for applications requiring reliable liquid distribution, gas-liquid contact, filtration, and support functions. With a robust welded structure, precise slot openings, and excellent resistance to fouling, wedge wire pipe helps improve tower reliability while reducing maintenance frequency.
Catalyst Bed Support Grid Design for High Efficiency Reactor Flow Catalyst Bed Support Grid Design for High Efficiency Reactor Flow
Jul .27.2026
Explore how Catalyst Bed Support Grid design affects reactor efficiency through optimized flow distribution, pressure control, catalyst stability, and structural strength. Learn key factors for improving catalyst performance and achieving reliable fixed-bed reactor operation.